lap-dat-ket-cau-cnc-vina

Installation structure

Characteristic

Steel structure installation is the last step in 3 important steps “Design – Fabrication – Installation”. Whether the project is completed or ensures the best quality depends a lot on the construction and erection process.

Vietnam CNC & Technology Application Joint Stock Company specializes in consulting, designing, supplying, and installing electromechanical systems for industrial production plants. Our steel structure construction and erection services offer customers the most attractive quality work. We ensure that all erection work is carried out strictly according to the requirements committed to our customers, ensuring worker safety and using the latest technology to ensure outstanding results.

We pride ourselves on our state-of-the-art steel structure erection equipment and methods. Our structural steel erection team can assist in a wide range of structural steel processes, including construction, installation, alteration, repair, maintenance, and dismantling.

lap-dat-day-chuyen-so-o-to

Image of CNC-VINA installing paint booth structure, industrial tanks, and chemical tanks

Our steel structure construction and installation process

Structural steel is an integral part of many construction projects. The quality of a steel erection often represents the core of the structure. To ensure excellent results in a construction and installation sector that can be logistically complex, we pay special attention to each step of the process, working towards completing the promised schedule with the customer.

Planning steel structure installation in advance

At CNC-VINA, quality and safety go hand in hand. Before starting any project, we use 3D structural models and simulations to fully understand the complexity of the building. This allows us to create comprehensive steel structure erection procedures, outlining the most efficient erection methods.

In addition, to visualize a complete skeleton of the project, we also provide a full floor plan detailing the crane's location, personnel requirements, unloading point, storage area, and access to a safe work area.

Inspect equipment and supplies

Before embarking on the construction and erection of steel structures, the preparation of machinery, materials, and tools must meet standards. The erection team checks the equipment's functionality and the required materials' quantity and quality. Timely detect errors and omissions to ensure safety for workers and work progress while ensuring quality.

On-site installation

CNC-VINA's end-to-end erection solutions include steel structure set-up and erection and on-site fabrication of steel structures. We are proactive in the source of supplies and materials. Installation workers are always available, assign specialized work, and are always proactive in assigned items. Ability to interact with customers and solve problems on-site quickly and flexibly. Technical and occupational safety requirements are always followed to minimize incidents affecting the progress of the project.

Why should you choose CNC-VINA as a structural installation contractor?

Provide customers with the most attractive quality works and services. We ensure that all erection work is carried out strictly according to the requirements committed to the customer, ensuring labor safety and quality are always maintained at the highest level.

When it comes to steel structure erection, we have three main goals: time, accuracy, and safety. Not only are we capable of meeting proposed deadlines, but we are also committed to maintaining the accuracy of each project. In the high-risk industry, we pay special attention to minimizing the level of risk; Our unique systems ensure the safe and efficient erection of any structure.

CNC-VINA is capable of erecting all kinds of steel structures from low to high complexity. The steel structure erection team is closely monitored by our engineering, plant, and project management to carry out the expected erection on schedule. Our goal is safe, efficient, quality service for all our steel structure customers.

Image of automotive PTED paint line structure designed, manufactured and installed by CNC-VINA

Customers who have demand for installation structure, please contact:

VIETNAM CNC & TECHNOLOGY APPLICATION JOINT STOCK COMPANY

North factory & Office: Song Cung Industrial Site, Dong Thap Commune, Dan Phuong District, City. Hanoi Vietnam

South office: Lot. H9, Tran Quoc Toan Str, Vo Nguyen Giap Distr., Thu Dau Mot City, Binh Duong Province

Phone: +84,915 74 4 664 / +84,915 740 880

Website: www.cncvina.com.vn; www.cncvina.net

Email: Sales01@cncvina.com.vn | Sales02@cncvina.com.vn

RELATED PRODUCTS

OUR PARTNERS